Hiring a Contractor in Ontario: Checks Before You Sign
Choosing the contractor usually decides how a renovation goes. A good one gives you a clear price, pulls the right permits, shows up when they say and fixes what goes wrong. A bad one can leave you with unfinished work, unpaid subcontractors, failed inspections and very little you can do about it. Most of the difference is visible before you sign, if you know what to check.
This guide covers the checks that matter in Ontario: what your contract must include, the rights the Consumer Protection Act gives you, insurance and WSIB, which trades must be licensed, who is responsible for permits, and the warning signs that should end a conversation. It is general information, not legal advice.
Get at least three detailed quotes
Ask each contractor to see the job in person and to give a written quote that breaks down the work. Quotes that are a single number are hard to compare and easy to argue about later. A useful quote lists the scope room by room or task by task, names the materials and finish levels, states what is excluded, and says who handles permits, disposal and cleanup.
When the prices come back, the lowest is not automatically the best value. Very low quotes often leave out items the others included, allow for cheaper materials or assume work will be done without permits. Line the quotes up against each other and ask each contractor about any gaps. How clearly they answer tells you a lot about how they will communicate once the work starts.
Your rights under Ontario's Consumer Protection Act
Most home renovation agreements must be in writing under Ontario's Consumer Protection Act, and you are entitled to a copy. If the contract was signed at your home, for example after a contractor came to your door or you invited them over to quote, you generally have a 10-day cooling-off period during which you can cancel for any reason, in writing, without penalty.
The Act also limits how far a final price can exceed an estimate without your agreement, and it gives you remedies when a contractor fails to deliver what was promised. If you run into a dispute, Consumer Protection Ontario can explain your options and accepts complaints. Keep every document, message and receipt, because a written record is your strongest protection.
What the written contract should include
A contract protects both sides by writing down what was agreed before memories diverge. Read the whole thing before signing and do not accept blank spaces or vague wording like finish as required. If the contractor will not put something in writing, treat it as not promised.
- The contractor's legal business name, address, phone number and HST number
- A detailed description of the work and the materials, including brands or models where they matter
- The total price with taxes, and the payment schedule tied to completed stages
- Start and completion dates, and what happens if they slip
- Who applies for and pays for building permits and arranges inspections
- How changes will be handled, priced and approved in writing
- Warranty terms on workmanship and who handles manufacturer warranties
- Cleanup, waste removal and protection of the rest of the house
Insurance and WSIB clearance
Ask for proof of commercial general liability insurance, and check that the policy is current and in the contractor's business name. If a worker damages your house or a neighbour's property, this is the policy that pays. You can call the insurer on the certificate to confirm it is in force.
Workplace safety insurance is equally important. In Ontario, most businesses in construction must register with the Workplace Safety and Insurance Board. Ask for a WSIB clearance certificate, which you can also look up on the WSIB website. If an uninsured worker is injured on your property, you can be exposed to claims that would otherwise be covered by the contractor's WSIB coverage. For larger projects, ask for a fresh clearance certificate before each major payment.
Licensed trades: electrical, gas and plumbing
Some work must be done by licensed people regardless of who the general contractor is. Electrical work for hire must be done by a Licensed Electrical Contractor, licensed by the Electrical Safety Authority. You can check the licence number on the ESA website, and the electrical contractor is responsible for filing the notification of work with ESA so the installation is inspected.
Gas work, including furnaces, water heaters, gas ranges, fireplaces and barbecue lines, must be done by technicians holding the appropriate TSSA certificate, and the company must be registered with TSSA. Plumbing should be done by a licensed plumber, and many municipalities also require a plumbing permit. For HVAC and refrigeration work on air conditioners and heat pumps, ask what certifications the technicians hold. On a larger renovation, ask your general contractor which licensed subcontractors they will use and check them too.
Permits and who pulls them
The property owner is ultimately responsible for making sure required permits are in place, but on most projects the contractor applies for them as part of the job. Put that responsibility in the contract. Structural changes, basement finishing, additions, new plumbing, many decks and foundation openings usually need a building permit from your municipality, and electrical work is covered separately through ESA.
A contractor who suggests skipping a required permit to save time or money is shifting risk onto you. Work done without a permit can be ordered opened up for inspection, can cause problems with insurance claims, and can surface at resale when a buyer's lawyer asks for permit records. Ask to see the permit before work begins, keep it posted on site, and do not close up walls until the required inspections have passed.
Deposits and payment schedules
A reasonable deposit covers the contractor's commitment to your start date and any custom-ordered materials. It should be a modest share of the total, not most of the job. Larger payments should follow real progress, such as completion of framing, passed inspections, or installed cabinets, rather than calendar dates.
Pay by cheque, e-transfer or card so there is a record, and get a receipt for every payment. Keep a holdback until the job is fully finished, including deficiencies. Under Ontario's Construction Act, owners on many projects are expected to hold back a portion of each payment for a set period so subcontractors and suppliers can be paid if the contractor does not pay them. Ask a lawyer or the contractor how the holdback applies to your job, especially on larger renovations.
Red flags that should end the conversation
Most bad contractor experiences share a few warning signs. Any one of them is a reason to slow down; several together are a reason to walk away.
- Cash only, or a discount offered for paying cash with no receipt
- A suggestion that skipping the permit will save you money
- Door-to-door offers, especially claims of leftover materials from a job nearby
- Pressure to sign today to lock in a price or a start date
- A large deposit requested before any work or material orders
- No written contract, or a contract that is vague about scope and price
- No proof of liability insurance, WSIB clearance or trade licences
- No verifiable business address, or references they cannot provide
This guide is general information for Ontario homeowners, not engineering or legal advice โ always confirm specifics with your municipality for your own project.