Permits

Which Home Renovations Need a Building Permit in Ontario?

Permits are the part of a renovation homeowners most want to skip and most regret skipping. A permit isn't a cash grab โ€” it's the paperwork that puts a building inspector's eyes on the work that keeps your house standing, dry and safe to sleep in. Skip one where it's required and you can be ordered to open finished walls back up, or hit a wall at resale when the buyer's lawyer asks for it.

The exact rules are set by the Ontario Building Code and enforced by your municipality, so the final word always comes from your local building department. But the general pattern below holds across Ontario, and it'll tell you which side of the line your project is likely on before you call.

Work that usually needs a permit

If a project changes the structure, the building's safety systems, or adds living space, assume a permit is in play:

  • Finishing a basement, or building a basement apartment / second suite
  • Removing or altering a load-bearing wall (this also needs engineered drawings)
  • Additions, dormers, or raising the roof
  • Cutting or enlarging an opening in a foundation โ€” including egress windows
  • New or heavily altered decks above a certain height (thresholds vary by municipality)
  • Adding or moving plumbing (a new bathroom, relocating a kitchen)
  • Structural changes to the roof
  • Installing a wood stove or fireplace

Work that usually doesn't

Cosmetic and like-for-like work generally doesn't need a permit โ€” but 'usually' is doing real work in that sentence, so confirm anything you're unsure about:

  • Painting, flooring, trim and cosmetic updates
  • Replacing kitchen cabinets and countertops in the same layout
  • Swapping a fixture for a similar one (a toilet for a toilet, a faucet for a faucet)
  • Re-shingling a roof with the same type of covering
  • Most fence work (though height and location are governed by municipal bylaws)

Electrical and gas are their own thing

Electrical work in Ontario is handled through the Electrical Safety Authority (ESA), not your municipal building permit โ€” the licensed electrical contractor files the notification. Gas work (furnaces, gas ranges, gas water heaters) falls under the TSSA and is done by a certified gas technician. These run in parallel with any building permit your renovation needs, and they're not optional.

Why it's worth doing properly

A permit means an inspector confirms the framing, insulation, and safety details are right before they're hidden behind drywall. That protects you now and protects the sale later โ€” unpermitted work is one of the most common things that stalls a real-estate deal or voids an insurance claim after a fire or flood. On any quote we give, permit needs are flagged up front, and for regulated trades the work is routed to contractors licensed to do it.

This guide is general information for Ontario homeowners, not engineering or legal advice โ€” always confirm specifics with your municipality for your own project.

Common questions

Who pulls the permit โ€” me or the contractor?
Either can, but it's usually cleaner for the contractor doing the work to pull it, since they're the ones the inspector deals with. Agree on this in writing before work starts so it doesn't fall through the cracks.
What happens if I skip a required permit?
The municipality can issue an order to comply, which may mean opening up finished work for inspection, and can levy penalties. It can also surface at resale, since buyers and their lawyers increasingly ask for permit records.
How long does a permit take?
It varies by municipality and project size โ€” small residential permits can be days, larger ones weeks. Build it into your timeline rather than treating it as an afterthought.

Ready when you are.

Tell us what your home needs โ€” a small fix or a full project โ€” and get a free quote.