Exterior & Outdoor Structures

Deck Building in Ontario

A deck built right in Ontario starts underground. Footings have to reach below the frost line β€” roughly four feet in most of the province β€” or the whole structure lifts and racks a little more every winter. Get the footings, ledger and joist spacing right and the deck above them is the easy part.

We build in pressure-treated lumber, cedar and composite. Pressure-treated is the workhorse: strong, economical, and happy to take a stain every few years. Cedar looks and smells the way a deck should but needs regular care. Composite costs more up front and then mostly leaves you alone β€” no staining, no splinters, a wash in the spring.

Many Ontario municipalities require a building permit once a deck passes certain height or size thresholds, and attached decks bring their own rules about ledger connections and railing heights. Those thresholds vary from town to town, so we sort out what applies to your property as part of the quote rather than leaving you to guess.

What this covers

  • Deck design and material selection
  • Footings dug and poured below frost line
  • Framing, decking and stairs
  • Railings in wood, aluminum or glass
  • Ledger attachment and flashing done properly
  • Permit drawings and application where required
  • Skirting, privacy screens and benches
  • Removal of an old deck before the new build

What affects the price

  • Deck size and height off the ground
  • Material β€” pressure-treated, cedar and composite are very different budgets
  • Number of stairs, landings and railing runs
  • Footing count and soil conditions β€” rock or wet ground slows digging
  • Whether a permit and drawings are required in your municipality
  • Railing choice β€” glass and aluminum cost more than wood
  • Access to the backyard for materials and equipment
  • Tearing out and disposing of an existing deck

Every home is different, so we don’t publish flat prices β€” the quote is free and based on your actual job.

Common questions

Do I need a permit to build a deck?
Often, but it depends on your municipality and the deck's height and size. Many Ontario towns require a permit once the walking surface is above a certain height or the deck is attached to the house. The thresholds genuinely vary, so we confirm the rules for your address during quoting and handle the drawings if a permit is needed.
Pressure-treated, cedar or composite β€” how do I choose?
Budget and appetite for maintenance. Pressure-treated is the least expensive and lasts decades if you stain it every two to three years. Cedar is beautiful and naturally rot-resistant but wants the same regular care. Composite roughly doubles the material cost and in exchange you never stain again. There's no wrong answer β€” just different trade-offs.
How long does a deck build take?
A straightforward ground-level deck is usually a few days once footings are in. A larger raised deck with stairs and railings runs longer, and permit approval adds lead time before we start. Weather matters too β€” footings and framing move fast in a dry week.
Can you build in cooler months?
Spring through fall is deck season, but we can dig and pour footings until the ground freezes and frame in cold weather fine. What we avoid is staining in the cold β€” new pressure-treated wood usually needs to dry out before staining anyway, so a fall-built deck often gets its first coat the following summer.
My yard slopes. Is a deck still possible?
Sloped yards are actually where decks earn their keep β€” they turn unusable grade into flat living space. The build needs taller posts, engineered footings and usually a permit, but it's routine work. A photo of the slope with your quote request helps us scope it.

Ready to sort out your deck building?

Tell us what your home needs β€” a small fix or a full project β€” and get a free quote.