Kitchens

The kitchen is the most renovated room in Canadian homes โ and one where scope varies enormously. Some homeowners want a full gut renovation with new layout, cabinets and countertops; others just need a new faucet installed, a cabinet door fixed or a backsplash tiled.
We quote both ends honestly. Describe your kitchen project, attach photos of the current space, and get a free quote โ whether it's a two-hour job or a two-month remodel.
Kitchens services in Ontario
Kitchen Renovation
Kitchen renovations quoted honestly โ cabinets, counters, tile and trades in the right order, from a hardware refresh to a full gut and rebuild.
Countertop Installation
New quartz, granite, laminate or butcher block counters โ measured, templated and installed cleanly, usually inside a day. Free quotes.
Kitchen Backsplash
Backsplash tiling that looks sharp up close โ straight lines, tight grout, clean silicone. Usually one or two days, quoted free from a photo.
Appliance Installation
Dishwasher, hood fan, washer or wall oven installed properly โ water, drain and venting done right, gas lines by certified techs. Free quotes.
Also available by quote
Planning kitchen work in Ontario
Kitchen budgets are decided mostly by three choices: cabinets (stock, semi-custom or custom), countertop material, and whether the layout moves. Keeping the sink, range and fridge where they are avoids new drain runs, gas line changes and new circuits. Switching from electric to gas cooking means a gas line installed by a TSSA-registered contractor, while an induction range or a more powerful hood may need a dedicated circuit and sometimes a panel upgrade. Quartz and stone counters are templated only after the base cabinets are set, then fabricated, which puts a pause in the middle of most projects.
Ask to see a written layout with appliance specifications confirmed before cabinets are ordered, because a fridge that doesn't fit the opening is an expensive surprise. Ask who coordinates the plumber, electrician and countertop fabricator, and how many days the kitchen will be out of action. The range hood deserves its own question: it should duct to the outside, suit the size of the cooktop, and in a tightly sealed house may call for make-up air. In older homes, expect ungrounded outlets or undersized wiring to show up once the backsplash comes off.
Cabinet lead times are the main scheduling constraint, and they stretch in the fall as everyone tries to finish before the holidays. Starting design in late summer or right after New Year tends to go more smoothly. To get a quote, describe what you want changed, list any appliances you're keeping, and upload photos of every wall of the kitchen with rough measurements. A faucet swap or new backsplash is quoted just as readily as a full remodel.
Common questions
Do I need a permit for a kitchen renovation in Ontario?
How long does a kitchen renovation take?
Is quartz or granite better for kitchen countertops?
Can I hook up a gas stove myself in Ontario?
Need kitchens work?
Describe the job โ big or small โ and get a free quote.