Service category

Roofing & Eavestroughs

Roofing & Eavestroughs work on an Ontario home

Ontario roofs work hard: freeze-thaw cycles, ice dams, summer heat and storm winds all take their toll. Catching a small leak or a run of lifted shingles early is far cheaper than repairing the water damage that follows.

From emergency leak repairs and eavestrough (gutter) cleaning to full roof replacement in asphalt shingle, metal or flat membrane systems, describe the problem โ€” photos help enormously โ€” and get a free quote.

Roof repair and replacement in Ontario: what to ask

A roofing quote depends on the roof's size and pitch, how many layers of old shingles must be stripped, how much rotten decking turns up once they're off, and the details. Chimneys, skylights, valleys, walls and vents each need flashing done properly, and steep roofs need more safety setup. The Ontario Building Code calls for eave protection along the lower edge of sloped roofs across most of the province. A proper ice and water membrane there, together with good attic ventilation, is what stops ice dams from pushing meltwater under the shingles.

Ask whether the quote covers replacing damaged decking and at what rate per sheet, which underlayment and ventilation products are included, and whether the shingle manufacturer's installation requirements are being followed so the warranty stays valid. Ask who handles disposal and magnetic sweeps for nails in your lawn and driveway. Roofers work at height, so WSIB coverage and fall-protection training are basic questions, not awkward ones. A like-for-like reroof usually doesn't need a building permit, but structural changes or new skylights may, depending on your municipality.

Most roofing in Ontario happens from spring to late fall, since asphalt shingles seal best in warm weather, while emergency leak repairs happen all year. Fall is the busiest season, so book a replacement for spring or summer if you can. Eavestroughs deserve a check after the leaves drop and again after the spring melt. For a quote, describe the symptom, such as leak location, missing shingles or ice buildup, and add photos taken from the ground or inside the attic. Never climb a wet or icy roof to get them.

Common questions

How long does a roof replacement take?
A typical detached house can often be stripped and reshingled in one to three days by a full crew, weather permitting. Complex roofs with many valleys, dormers or skylights, extensive deck replacement, or a switch to metal take longer. Rain delays are normal, and a careful crew only strips as much as it can dry in and cover the same day.
What causes ice dams on Ontario roofs?
Heat escaping from the house warms the roof deck and melts snow, which refreezes at the colder eaves. That ridge of ice holds back meltwater, which can back up under shingles and leak into walls and ceilings. The lasting fixes are attic air sealing and insulation, better ventilation, and eave protection membrane under the shingles. Heat cables only treat the symptom.
Can a roof be repaired instead of replaced?
Often, yes. A few missing shingles, failed flashing around a chimney or vent, or a single leak on an otherwise sound roof can usually be repaired. Replacement makes more sense when shingles are curling, cracking or shedding granules across the whole roof, when leaks keep appearing in different spots, or when the roof is near the end of its expected life.
Should eavestroughs be replaced along with the roof?
It often makes sense. Troughs are easier to replace while the roof edge is being worked on, drip edge and fascia can be repaired at the same time, and dented or sagging troughs won't drain a new roof properly. If yours are continuous aluminum in good shape and sloped correctly, they can stay. Downspouts should discharge well away from the foundation.

Need roofing & eavestroughs work?

Describe the job โ€” big or small โ€” and get a free quote.